Register  |  Login
       
 
Projects - Waste Assessment
 
Projects - Waste Assessment
Minimize

 Waste Assessment - Recent and Current Projects

 

 Site

Client 

Project

 Description

  SGHWR, Winfrith UKAEA SGHWR North Annex H-3 Characterisation Full DQO waste assessment and DQO process training for UKAEA staff.
  GHF, Chapelcross BNG ILW / LLW Separation Production of waste separation techniques and theshold calculations for ILW cans at the Graphite Handling Facility.
  A58, Winrith UKAEA WACM Clearance Monitoring Waste screening techniqes and comprehensive direct-probe theshold calculations for processed, formerly active steel.
   S2S, Winfrith UKAEA  Soil Screening Construction of in-situ survey regimes to determine soil clearances at instance of remedation.
   Winfrith UKAEA  Waste Drum Screening Construction of 6 point monitoring system for multiple fingerprints.
  Winfrith UKAEA Active Process Ducting Construction of concrete in-situ waste screening regime. Included full justification documentation.
  SGHWR, Winfrith UKAEA Direct Probe Screening Creation of comprehensive direct probe exemption level calculation system for painted and non-painted surfaces. Included full waste decision process, averaging systems and full justification documentation.

 


 
Contact Us
 
Contact Us
Minimize

For general enquiries please call Greg Wells on:

01929 401040

Alternatively, please click here to mail us.

 


 
  February 07, 2012
Copyright 2011 :: VAT Number: 812 1663 58 :: Co. Registration No.: 4651164 (England)   ::  DotNetNuke  ::  Terms Of Use  ::  Privacy Statement